Skip to main content

04 · IMPROVE

Data center infrastructure audit and technical assurance

Atlas helps clients understand the condition, risk and priorities of their infrastructure.

Typical scope

What Atlas can cover, in full or in part, depending on your programme.

  1. 01Infrastructure condition assessment
  2. 02Electrical systems
  3. 03Mechanical systems
  4. 04Cooling
  5. 05Fire detection and suppression
  6. 06BMS / EPMS
  7. 07Operating procedures
  8. 08Maintenance programmes
  9. 09Operational performance reviews
  10. 10Maintenance strategy optimisation
  11. 11Resilience and redundancy
  12. 12Capacity
  13. 13Documentation
  14. 14Compliance
  15. 15Operational readiness
  16. 16Single points of failure
  17. 17Asset lifecycle

A useful audit tells you what to address first, not only what is wrong.

Atlas turns technical observations into prioritised operational decisions: for each finding, the risk, the operational consequence, the urgency, the action and the verification after remediation.

Method

Observe, assess, prioritise, act

  1. 01 · Observe

    Findings backed by observed evidence, within an explicit scope.

  2. 02 · Assess

    The risk created and its operational consequence.

  3. 03 · Prioritise

    Urgency and order of treatment, so you can decide.

  4. 04 · Act

    The action plan, then verification after remediation.

From finding to decision

A finding without a priority does not help you decide

Risk by operational impact matrix: abstract findings, labelled A to F, are distributed; those at the top right are addressed first.

What the report lets you decide

  1. 01What was observed?
  2. 02What risk does it create?
  3. 03What is the operational consequence?
  4. 04How urgent is it?
  5. 05What should be done?
  6. 06What should be verified after remediation?

How each finding is read

  1. Condition
  2. Risk
  3. Impact
  4. Action

An audit assesses risk; it does not guarantee the absence of failure.

Typical situations

How Atlas can support you

  1. 01Before taking over or acquiring a site.
  2. 02After a significant incident.
  3. 03Before a capacity change.
  4. 04To prioritise an investment or renewal plan.

Entry engagement

Operational readiness review

Before delivery or when taking over a site, a status of what is ready, what is missing and the order in which to address it.

Request this engagement

Entry engagement

Focused assessment

An audit limited to one system or one specific risk, for an independent opinion without committing to a full audit.

Request this engagement

What you get

  • Audit report: findings, risks, impact, actions
  • Prioritised risk register
  • Ordered action plan
  • Executive summary
  • Verification after remediation, where included in scope

To get started: As-built files and diagrams, maintenance and incident history, existing procedures and contracts, access under your safety rules.

Audit questions

Can an audit cover a single system?

Yes. A focused assessment can be limited to one system, one risk or one site, and can prepare a wider audit if needed.

What does the report contain?

Findings ranked by risk and impact, each with its recommended action and priority, plus a summary for management.

When should an audit be carried out?

Before taking over a site, after a significant incident, before a capacity change, or periodically to track asset condition.

Let’s talk about your project

Describe what you need: we clarify the scope before any proposal.